Scratch / Dent

Menu

Dent_icon_side
Measurement_icon_side
color_icon_side
OCV_icon_side
OCR_icon_side
findding_icon_side
barcode_icon_side
counting_icon_side

Spiral Inspection

Project Specification

1. Detect Spiral hold
2. Torrance not more than 3 mm.
3. Process time is 1 pic / 200 ms.
4. Alarm System for NG Product
5. Login System
6. Report System
– NG product
– Summary Report
7. Alarm System and reject signal for NG product

Slimz

slimz2_small

Medusa control

Processing Controller_2

Lighting

Lighting_2

Lighting control

lighting_control

Pin Inspection

Project Specification

  1. How to inspection cap, cap dent from cap
  2. How to inspection pin dent, pin broken , solder ball from pin
  3. How to inspection wire dam from wire
  4. Size of object in maximum about 2×2 cm
  5. How to rotation of object is not over 90 degree
  6. Alarm System And Reject System for NG Product
  7. Specification and defection of pin and cap inspection
  8. Mechanic design and develop by EIWA
  9. Login system (User permission)
  10. Report system
    • Real time report on graphic user interface represent Status.NG Type And  real time report total inspection of active user represent Lot No.Total Input., Total Pass., Total NG., User.
    • Total report on browser can select by date, NG Type, User,Lot no. for represent.
  11.  Setting system
    • Administrator can change number of continue NG for transfer data (5 V) to Parallel port (DB 25.). And transfer data (5 V) to Parallel port (DB 25) different line for every NG status.
    • Administrator can change luminance and setting of light source

Slimz

slimz2_small

Medusa control

Processing Controller_2

Lighting

Lighting_2

Lighting control

lighting_control

Wheel Inspection

Project Specification

1. inspect the accuracy of the Model Alloy Wheels
2. inspect  Ring booth
3. inspect size of the ring
4. Alarm System for NG Product
5. Login System
6. Report System
– NG product
– Summary Report
7. Alarm System and reject signal for NG product

Iksr2

IKSR2_3e_small

Medusa control

Processing Controller_2

Lighting

Lighting_2

Lighting control

lighting_control

Slag Inspection

Project Specification

  1. Check the amount of slag within a molten iron at a temperature of 1600 degrees.
  2. Improve productivity of enterprises producing parts, iron and steel materials.
  3. The program will be recorded by video during a slag. To save time before the slag and slag was born and records to the database.
  4. Database systems can be connected to the SAP system or the ERP.
  5. Program supports connectivity to the camcorder heat through IEEE1394 port and port S-Video.
  6. Alarm System And Reject System
  7. Iron slag in water monitoring programs can work. The operating system and the Windows operating system to Linux.

Iviz

Iviz_small

Medusa control

Processing Controller_2

Lighting

Lighting_2

Lighting control

lighting_control

Cap Inspection

Project Specification

  1. inspect sctatch inside and outside the cap.
    • Width ,Length, height
    • Radius around the cover
    • Inside the cover
  2. Alarm System And Reject System for NG Product
  3. Report checking
    • Scratch Number NG R NG Report
    • Scartch NG Report
    • Position  NG Report
    • Summary Report

Iviz

Iviz_small

Medusa control

Processing Controller_2

Lighting

DSC_7717

Lighting control

lighting_control

Roof Inspection

Project Specification

1. inspect scratch on the roof
2. Alarm System for NG Product
3. Login System
4. Report System
– NG product
– Summary Report
5. Alarm System and reject signal for NG product

Iviz

Iviz_small

Medusa control

Processing Controller_2

Lighting

DSC_7717

Lighting control

lighting_control

SMP Button Inspection

Project Specification

  1. Inspect
    • Scratch
    • Bit problem
    • Leg button problem
    • Grain
    • Type SMP Button
  2. Alarm System And Reject System for NG Product
  3. Report checking
    • Bit Problem (Eg. Scracth , Overlap , Lose Bit)
    • Grain Report
    • Scartch on edge  NG Report
    • No type in hole NG Report
    • Summary Repor

Fire Cam

fire_cam_small

Medusa control

Processing Controller_2

Lighting

Lighting_small

Lighting control

lighting_control

Spiral Nut Inspection

Project Specification

  1. Check breach of the screws that meet the standards.
  2. Check screw root crest width
  3. Alarm System And Reject System for NG Product
  4. Report checking
    • Number NG Report
    • Distance  NG Report
    • Scartch NG Report
    • Position  NG Report
    • Summary Report

Cube

Cube_small

Medusa control

Processing Controller_2

Lighting

Lighting_2

Lighting control

lighting_control

Transparent Socket Inspection

Project Specification

  1. inspect socket that have cracks
  2. inspect socket size meets the standards or not.
  3. inspect that have dent and scratch
  4. Alarm System And Reject System for NG Product
  5. Report checking
    • Hole Number NG Report
    • Distance Hole NG Report
    • Scartch NG Report
    • Position Hole NG Report
    • Summary Report

Cube

Cube_small

Medusa control

Processing Controller_2

Lighting

Lighting_2

Lighting control

lighting_control

Water On Steel Plate Inspection

Project Specification

  1. Inspect Water mark pending on steel plate
  2. inpsect scratch on steel plate
  3. Plate steel maximum width 700 m
  4. Speed of movement the steel plate is 70 meter per minute
  5. Alarm System And Reject System for NG Product
  6. Report System
    • Prosition Number NG Report
    • Scartch NG Report
    • Summary Report

Cube

Cube_small

Medusa control

Processing Controller_2

Lighting

Lighting_2

Lighting control

lighting_control

Mask Inspection

Project Specification

  1. Inspect correct depleted and complete of mark
  2. Size of object in maximum 10×20 cm
  3. Modify template for inspection
  4. Transform the angle space and level of light source
  5. Move the space and point of view camera angle
  6. Alarm System And Reject System for NG Product
  7. Report system
    • NG product
    • Summary Report

Fire Cam

fire_cam_small

Medusa control

Processing Controller_2

Lighting

Lighting_small

Lighting control

lighting_control

Harddisk Part Inspection

Project Specification

  1. Inspect indentations and scratches harddisk part.
  2. Alarm System And Reject System for NG Product.
  3. Report checking
      • Hole Number NG Report
      • Distance Hole NG Report
      • Scartch NG Report
      • Position Hole NG Report
      • Summary Report

Fire Cam

fire_cam_small

Medusa control

Processing Controller_2

Lighting

Lighting_small

Lighting control

lighting_control

Disk Chock Inspection

Project Specification

  1. Inspect Disk Chock
  2. Alarm System And Reject System for NG Product
  3. Report checking
    • Hole Number NG Report
    • Distance Hole NG Report
    • Scartch NG Report
    • Position Hole NG Report
    • Summary Report

Iksr2

IKSR2_3e_small

Medusa control

Processing Controller_2

Lighting

Lighting_2

Lighting control

lighting_control